Case Study · Smart Metering

Validating a Utility Head-End System at 5 Million Meters

Utilities buying a head-end system ask for proof that it performs at their scale and that infrastructure costs are estimated correctly. One of the largest engineering conglomerates could not produce that proof with home-grown simulators. Here is how it validates any deployment size on demand.

5M+
Meters Validated
3
Meter Types
IPv4 + IPv6
Cellular and Mesh
The Context

A performance-critical system that customers will not buy without proof

The client, one of the largest engineering conglomerates, sells a head-end system that collects meter data over RF mesh and cellular networks, giving utilities coverage across any service territory. Demand is rising with the global push toward smart energy, and four realities shape validation.

1

Massive deployments

The system supports very large rollouts, with single deployments reaching 5 million devices.

2

Gas, electricity, and water

Three meter types run across IPv4 cellular and IPv6 mesh networks, each with its own data collection and processing configuration.

3

Proof before purchase

Utilities request validation reports confirming the system works in their specified context before they buy.

4

Infrastructure cost accuracy

Those reports also have to confirm that deployment infrastructure costs are estimated correctly, with no surprises later.

The Shift

From simulator bottlenecks to validation at any scale, on demand

Before Doppelio
  • −A dedicated performance engineering team built in-house simulators for meter protocols such as DLMS and C12.22.
  • −The home-grown simulators did not keep up on scale, speed, flexibility, or business demands.
  • −Developer turnover weakened the simulator strategy over time.
  • −The simulators could not reach the scale prospects required, which put deals at risk.
  • −Complex requirements stayed out of reach, such as IPv6 and pull workloads where the head-end connects to each meter individually.
With Doppelio
  • ✓Doppelio models meters across metering protocols (DLMS, C12.22) and networking protocols (IPv4, IPv6).
  • ✓Doppelio runs tests on demand with any number of meters, with validation reaching 5 million.
  • ✓Doppelio covers any load pattern and per-second throughput across different metering schedules.
  • ✓Doppelio lets the team tune the platform for a specific workload configuration.
  • ✓Doppelio gives the team validation reports it presents to prospects with confidence.
  • ✓Doppelio shortens the turnaround for testing and reporting.
Doppelio Impact
5M+
On-Demand Testing
The team validates deployments of over 5 million devices whenever a prospect or release requires it.
Faster
Testing and Reporting
Turnaround for testing and validation reports shortens, keeping deals moving.
Greater
Report Confidence
Utilities receive validation reports that show the system performs in their context at a known infrastructure cost.

View More Success Stories on IoT Testing

Get to know more about how we've solved diverse challenges when it comes to IoT Testing.