Test Smart Meters at Scale
Comprehensively validate smart metering platforms across devices, configurations, networks, and real-world field conditions.

Smart Metering Testing is Hard
Smart metering platforms fail in the field due to device diversity, legacy protocols, extreme network conditions, and limited lab setups.
Virtualize Meters. Simulate Reality. Validate Everything.
Doppelio eliminates device dependence and lets teams model any meter, simulate any data pattern, and run unlimited tests under any network and scale conditions.
Higher Confidence. Faster Releases. Lower Cost.
Doppelio improves reliability while cutting validation effort, infrastructure needs, and field-testing cycles.
Faster Releases
Cut test cycles dramatically.
Parallel testing with virtual devices reduces long lab cycles, enabling faster product iterations and quicker customer rollouts.
Higher Test Coverage
Test everything without constraints.
Move from limited physical tests to 360° validation across device variants, environments, and network scenarios—achieving up to 90%+ test coverage.
Lower Cost of Quality
Reduce lab effort and field issues.
Minimize dependence on physical devices, avoid field defects, and reduce test infrastructure and manpower costs.
Confident Field Deployments
Ship with zero surprises.
Spot defects early through controlled, repeatable testing with production-like data and stateful device behavior.
Smart Metering Validated at Scale
A Fortune 100 engineering company used Doppelio to virtualize diverse meter types, simulate unlimited scenarios, and test for scale and network conditions — achieving faster cycles, higher quality releases, and reduced dependence on channel partners.
